Tier 5 Standard

LR DEVELOPMENT

📍 CARR 681 KM 6.8 BO ISLOTE, ARECIBO, PR 00612🏭 New Multifamily Housing Construction (except For-Sale Builders) (NAICS 236116)📅 2008-07-08
$3,250.00
Total Penalties
4
Citations
2/100
Risk Score
392
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, LR DEVELOPMENT — a new multifamily housing construction (except for-sale builders) facility located at CARR 681 KM 6.8 BO ISLOTE, ARECIBO, PR 00612 — was the subject of a formal OSHA inspection that resulted in 4 citation(s) and cumulative proposed penalties of $3,250.00. The inspection case was opened on 2008-07-08.

DOL records document workplace safety violations warranting formal citation under the OSH Act. While classified at the standard enforcement level, all OSHA citations require corrective action and may indicate areas where workplace safety programs should be strengthened.

BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 2.8 per 100 full-time workers — 4% above the national average of 2.7. The sector fatality rate is 9.6 per 100,000 workers.

Industry Benchmark: The total penalty of $3,250.00 is approximately in line with the national average of $3,609.14 for facilities in the Construction sector (NAICS 236116). This sector encompasses 532,749 inspected facilities nationwide with aggregate penalties totaling $1,922.8M.

State Context: Within PR, this facility's penalty places it at the 90th percentile among 29,311 inspected facilities. The statewide average penalty is $1,322.38.

Citation Analysis: The inspection produced 4 citations spanning 4 distinct OSHA regulatory standards. The citation breakdown includes: 2 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition. 2 other-than-serious — The violation has a direct relationship to job safety and health but is unlikely to cause death or serious physical harm.

Enforcement Timeline: Citations were issued beginning September 11, 2008 with the latest abatement deadline set for September 30, 2008. Of the 4 total citations, 2 (50%) have been marked as abated in DOL records, suggesting partial progress toward required corrective actions.

Penalty Assessment: The total proposed penalty of $3,250.00 falls within OSHA's standard enforcement range and may have been adjusted through informal settlement conference procedures, penalty reduction factors, or good faith credit for demonstrated safety and health management systems.

Industry Benchmark (PR)

This facility's $3,250 penalty is higher than 68% of all penalized companies in the NAICS 236116 industry in PR. The state average penalty for this industry is $4,470.

$4,470
State Avg
$3,250
This Facility
Citation Matrix — 4 Citations
29 CFR 1926.501(b)(01)
Fall Protection Scope & Applications (Construction)
Serious
Penalty: $1,750.00Gravity: 05Issued: September 11, 2008Abated: Pending
29 CFR 1926.652(a)(01)
Other-than-Serious
Penalty: $450.00Gravity: 02Issued: September 11, 2008Abated: ✓ Yes
29 CFR 1926.503(a)(02)
Fall Protection Training
Serious
Penalty: $450.00Gravity: 01Issued: September 11, 2008Abated: ✓ Yes
29 CFR 1926.21(b)(02)
Safety Training & Education Programs
Other-than-Serious
Penalty: $600.00Gravity: 03Issued: September 11, 2008Abated: Pending
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
Local Competitor Benchmark

Comparing penalized facilities in ARECIBO, PR (Exact Industry)

LR DEVELOPMENT (This Facility)
$3.3K
4 cit.
C&C SE
$111.5K
33 cit.
P.C. GROUP, CORP
$3.9K
2 cit.
CARIBBEAN GENERAL GROUP CORP
$2.3K
8 cit.
More PR Enforcement Records
THE BATTERY RECYCLING CO., INC.
ARECIBO, PR
$262.9K
90 cit.
LUMA ENERGY SERVCO, LLC Y/O LUMA ENERGY, LLC
SAN JUAN, PR
$136.0K
68 cit.
DE ESC VOC MIGUEL SUCH
SAN JUAN, PR
$135.0K
24 cit.
LUMA ENERGY MANAGECO, LLC Y/O LUMA ENERGY SERVCO, LLC
GUAYANILLA, PR
$120.0K
60 cit.
C&C SE
ARECIBO, PR
$111.5K
33 cit.
Other Inspected Facilities in ARECIBO, PR
THE BATTERY RECYCLING CO., INC.
$262.9K
90 cit.
C&C SE
$111.5K
33 cit.
MUNICIPIO DE ARECIBO-DIVISI?N DE TRANSPORTE Y EQUIPO
$64.0K
29 cit.
SD IRON WORK & GENERAL CONTRACTOR
$42.5K
9 cit.
MUNICIPIO DE ARECIBO - PROGRAMA DE RECICLAJE
$36.5K
15 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Construction Safety Data →
Industry-wide violation stats and rankings.
Penalty Calculator →
Estimate fines by violation type, industry, and size.

Explore more: OSHA enforcement in ARECIBO · Puerto Rico data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was LR DEVELOPMENT cited for?

LR DEVELOPMENT received 4 citation(s) covering 4 distinct OSHA standards. Total proposed penalties were $3,250.00. The inspection opened on 2008-07-08.

How much was LR DEVELOPMENT fined by OSHA?

OSHA proposed penalties of $3,250.00 against LR DEVELOPMENT in ARECIBO, PR. Average per citation: $812.50.

Is LR DEVELOPMENT a safe workplace?

Based on enforcement records, LR DEVELOPMENT has a risk score of 2 out of 100. DOL records document workplace safety violations warranting formal citation under the OSH Act. While classified at the standard enforcement level, all OSHA citations require corrective action and may indicate areas where workplace safety programs should be strengthened.

How does this penalty compare to the industry average?

The average penalty for New Multifamily Housing Construction (except For-Sale Builders) facilities is $3,609.14. This facility penalty of $3,250.00 is below the industry average.