ULTIMATE MOLD FINISHING, INC.
According to U.S. Department of Labor enforcement records, ULTIMATE MOLD FINISHING, INC. — a industrial mold manufacturing facility located at 22N029 PEPPER RD., LAKE BARRINGTON, IL 60010 — was the subject of a formal OSHA inspection that resulted in 11 citation(s) and cumulative proposed penalties of $4,434.00. The inspection case was opened on 2013-01-03.
The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.
BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 3.3 per 100 full-time workers — 22% above the national average of 2.7. The sector fatality rate is 2.3 per 100,000 workers.
Industry Benchmark: The total penalty of $4,434.00 is 31% below the national average of $6,436.62 for facilities in the Manufacturing sector (NAICS 333511). This sector encompasses 82,943 inspected facilities nationwide with aggregate penalties totaling $533.9M.
State Context: Within IL, this facility's penalty places it at the 82th percentile among 88,899 inspected facilities. The statewide average penalty is $3,496.90.
Citation Analysis: The inspection produced 11 citations spanning 6 distinct OSHA regulatory standards. The citation breakdown includes: 9 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition. 2 other-than-serious — The violation has a direct relationship to job safety and health but is unlikely to cause death or serious physical harm.
Enforcement Timeline: Citations were issued beginning January 16, 2013 with the latest abatement deadline set for April 22, 2013. Of the 11 total citations, 0 (0%) have been marked as abated in DOL records, which may indicate ongoing compliance gaps requiring further regulatory attention.
Penalty Assessment: The total proposed penalty of $4,434.00 falls within OSHA's standard enforcement range and may have been adjusted through informal settlement conference procedures, penalty reduction factors, or good faith credit for demonstrated safety and health management systems.
This facility's $4,434 penalty is higher than 59% of all penalized companies in the NAICS 333511 industry in IL. The state average penalty for this industry is $9,464.
Comparing penalized facilities in LAKE BARRINGTON, IL (Broader Sector)
Explore more: OSHA enforcement in LAKE BARRINGTON · Illinois data · Search the database · Incident Rate Calculator
What OSHA violations was ULTIMATE MOLD FINISHING, INC. cited for?
ULTIMATE MOLD FINISHING, INC. received 11 citation(s) covering 6 distinct OSHA standards. Total proposed penalties were $4,434.00. The inspection opened on 2013-01-03.
How much was ULTIMATE MOLD FINISHING, INC. fined by OSHA?
OSHA proposed penalties of $4,434.00 against ULTIMATE MOLD FINISHING, INC. in LAKE BARRINGTON, IL. Average per citation: $403.09.
Is ULTIMATE MOLD FINISHING, INC. a safe workplace?
Based on enforcement records, ULTIMATE MOLD FINISHING, INC. has a risk score of 15 out of 100. The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.
How does this penalty compare to the industry average?
The average penalty for Industrial Mold Manufacturing facilities is $6,436.62. This facility penalty of $4,434.00 is below the industry average.