Tier 5 Standard

JUAN ACERO DBA SPEEDY 3 CONSTRUCTION

📍 75 CEDAR STREET, HAVERHILL, MA 01830🏭 Roofing Contractors (NAICS 238160)📅 2012-04-30
$36,960.00
Total Penalties
7
Citations
25/100
Risk Score
406
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, JUAN ACERO DBA SPEEDY 3 CONSTRUCTION — a roofing contractors facility located at 75 CEDAR STREET, HAVERHILL, MA 01830 — was the subject of a formal OSHA inspection that resulted in 7 citation(s) and cumulative proposed penalties of $36,960.00. The inspection case was opened on 2012-04-30.

DOL records document workplace safety violations warranting formal citation under the OSH Act. While classified at the standard enforcement level, all OSHA citations require corrective action and may indicate areas where workplace safety programs should be strengthened.

BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 2.8 per 100 full-time workers — 4% above the national average of 2.7. The sector fatality rate is 9.6 per 100,000 workers.

Industry Benchmark: The total penalty of $36,960.00 is more than 10.2× the national average of $3,609.14 for facilities in the Construction sector (NAICS 238160). This sector encompasses 532,749 inspected facilities nationwide with aggregate penalties totaling $1,922.8M.

State Context: Within MA, this facility's penalty places it at the 99th percentile among 60,671 inspected facilities. The statewide average penalty is $2,824.83.

Citation Analysis: The inspection produced 7 citations spanning 5 distinct OSHA regulatory standards. The citation breakdown includes: 2 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition. 5 repeat — A substantially similar violation was found during a previous inspection and the original citation has become a final order.

Enforcement Timeline: Citations were issued beginning July 17, 2012 with the latest abatement deadline set for July 31, 2012. Of the 7 total citations, 0 (0%) have been marked as abated in DOL records, which may indicate ongoing compliance gaps requiring further regulatory attention.

Penalty Assessment: The cumulative penalty of $36,960.00 reflects OSHA's gravity-based penalty calculation methodology, which considers the severity of potential injury, the probability of occurrence, the employer's size, good faith, and violation history. The per-citation average of $5,280.00 falls within the standard penalty range.

The enforcement profile for Juan Acero, operating as Speedy 3 Construction, reveals a deeply entrenched pattern

Industry Benchmark (MA)

This facility's $36,960 penalty is higher than 98% of all penalized companies in the NAICS 238160 industry in MA. The state average penalty for this industry is $6,953.

$6,953
State Avg
$36,960
This Facility
Citation Matrix — 7 Citations
29 CFR 1926.300(b)(02)
Serious
Penalty: $3,080.00Gravity: 10Issued: July 17, 2012Abated: Pending
29 CFR 1926.1053(b)(04)
Ladders (Construction)
Serious
Penalty: $3,080.00Gravity: 10Issued: July 17, 2012Abated: Pending
29 CFR 1926.451(b)(05)
Scaffolding Safety Requirements
Repeat
Penalty: $6,160.00Gravity: 10Issued: July 17, 2012Abated: Pending
29 CFR 1926.501(b)(13)
Fall Protection Scope & Applications (Construction)
Repeat
Penalty: $6,160.00Gravity: 10Issued: July 17, 2012Abated: Pending
29 CFR 1926.503(a)(01)
Fall Protection Training
Repeat
Penalty: $6,160.00Gravity: 10Issued: July 17, 2012Abated: Pending
29 CFR 1926.1053(b)(15)
Ladders (Construction)
Repeat
Penalty: $6,160.00Gravity: 10Issued: July 17, 2012Abated: Pending
29 CFR 1926.1053(b)(16)
Ladders (Construction)
Repeat
Penalty: $6,160.00Gravity: 10Issued: July 17, 2012Abated: Pending
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
Local Competitor Benchmark

Comparing penalized facilities in HAVERHILL, MA (Exact Industry)

JUAN ACERO DBA SPEEDY 3 CONSTRUCTION (This Facility)
$37.0K
7 cit.
BARRY BILLCLIFF DBA MERR. VALLEY R & G
$58.1K
7 cit.
THE ROOF KINGS LLC
$44.4K
18 cit.
CA CONSTRUCTION INC.
$36.2K
4 cit.
More MA Enforcement Records
ATLANTIC COAST UTILITIES, LLC, ADVANCED UTILITIES, INCORPORATED
BOSTON, MA
$1.4M
32 cit.
TEWKSBURY INDUSTRIES, INC.
TEWKSBURY, MA
$768.6K
61 cit.
WYMAN-GORDON CO. EASTERN DIVISION
NO. GRAFTON, MA
$624.0K
203 cit.
BOSTIK, INC.
MIDDLETON, MA
$614.8K
56 cit.
TRIBE MEDITERRANEAN FOODS, INCORPORATED
TAUNTON, MA
$540.0K
18 cit.
Other Inspected Facilities in HAVERHILL, MA
CEDAR'S MEDITERRANEAN FOODS, INC.
$110.1K
13 cit.
BARRY BILLCLIFF DBA MERR. VALLEY R & G
$58.1K
7 cit.
CVS PHARMACY
$51.3K
21 cit.
JOSEPH'S GOURMET PASTA COMPANY
$50.0K
12 cit.
THE ROOF KINGS LLC
$44.4K
18 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
After an OSHA Inspection →
Citations, appeals, and penalty negotiation steps.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Construction Safety Data →
Industry-wide violation stats and rankings.

Explore more: OSHA enforcement in HAVERHILL · Massachusetts data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was JUAN ACERO DBA SPEEDY 3 CONSTRUCTION cited for?

JUAN ACERO DBA SPEEDY 3 CONSTRUCTION received 7 citation(s) covering 5 distinct OSHA standards. Total proposed penalties were $36,960.00. The inspection opened on 2012-04-30.

How much was JUAN ACERO DBA SPEEDY 3 CONSTRUCTION fined by OSHA?

OSHA proposed penalties of $36,960.00 against JUAN ACERO DBA SPEEDY 3 CONSTRUCTION in HAVERHILL, MA. Average per citation: $5,280.00.

Is JUAN ACERO DBA SPEEDY 3 CONSTRUCTION a safe workplace?

Based on enforcement records, JUAN ACERO DBA SPEEDY 3 CONSTRUCTION has a risk score of 25 out of 100. DOL records document workplace safety violations warranting formal citation under the OSH Act. While classified at the standard enforcement level, all OSHA citations require corrective action and may indicate areas where workplace safety programs should be strengthened.

How does this penalty compare to the industry average?

The average penalty for Roofing Contractors facilities is $3,609.14. This facility penalty of $36,960.00 is above the industry average.