According to U.S. Department of Labor enforcement records, JMH CONSTRUCTION — a framing contractors facility located at LOT 49 6815 BERKLEY RD, CUMMING, GA 30040 — was the subject of a formal OSHA inspection that resulted in 12 citation(s) and cumulative proposed penalties of $53,900.00. The inspection case was opened on 2011-12-29.
Cumulative penalties significantly exceed the national median for OSHA enforcement actions. The penalty amount suggests multiple high-gravity citations, indicating conditions that presented a substantial probability of death or serious physical harm to employees.
BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 2.8 per 100 full-time workers — 4% above the national average of 2.7. The sector fatality rate is 9.6 per 100,000 workers.
Industry Benchmark: The total penalty of $53,900.00 is more than 14.9× the national average of $3,609.14 for facilities in the Construction sector (NAICS 238130). This sector encompasses 532,749 inspected facilities nationwide with aggregate penalties totaling $1,922.8M.
State Context: Within GA, this facility's penalty places it at the 99th percentile among 48,956 inspected facilities. The statewide average penalty is $3,799.18.
Citation Analysis: The inspection produced 12 citations spanning 7 distinct OSHA regulatory standards. The citation breakdown includes: 9 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition. 2 other-than-serious — The violation has a direct relationship to job safety and health but is unlikely to cause death or serious physical harm. 1 repeat — A substantially similar violation was found during a previous inspection and the original citation has become a final order.
Enforcement Timeline: Citations were issued beginning June 28, 2007 with the latest abatement deadline set for April 17, 2012. Of the 12 total citations, 6 (50%) have been marked as abated in DOL records, suggesting partial progress toward required corrective actions.
Penalty Assessment: The cumulative penalty of $53,900.00 reflects OSHA's gravity-based penalty calculation methodology, which considers the severity of potential injury, the probability of occurrence, the employer's size, good faith, and violation history. The per-citation average of $4,491.67 falls within the standard penalty range.
The enforcement record for JMH Construction reveals a systemic breakdown in fundamental safety management, characterized by a blatant disregard for fall protection and personal protective equipment (PPE) requirements. The most significant finding is the Repeat violation of 29 CFR 1926.501(b)(13), which carried a $35,000
This facility's $53,900 penalty is higher than 99% of all penalized companies in the NAICS 238130 industry in GA. The state average penalty for this industry is $5,935.
Comparing penalized facilities in CUMMING, GA (Exact Industry)
Explore more: OSHA enforcement in CUMMING · Georgia data · Search the database · Incident Rate Calculator
What OSHA violations was JMH CONSTRUCTION cited for?
JMH CONSTRUCTION received 12 citation(s) covering 7 distinct OSHA standards. Total proposed penalties were $53,900.00. The inspection opened on 2011-12-29.
How much was JMH CONSTRUCTION fined by OSHA?
OSHA proposed penalties of $53,900.00 against JMH CONSTRUCTION in CUMMING, GA. Average per citation: $4,491.67.
Is JMH CONSTRUCTION a safe workplace?
Based on enforcement records, JMH CONSTRUCTION has a risk score of 41 out of 100. Cumulative penalties significantly exceed the national median for OSHA enforcement actions. The penalty amount suggests multiple high-gravity citations, indicating conditions that presented a substantial probability of death or serious physical harm to employees.
How does this penalty compare to the industry average?
The average penalty for Framing Contractors facilities is $3,609.14. This facility penalty of $53,900.00 is above the industry average.