Tier 4 Systematic

BTR SEALING SYSTEMS NORTH AMERICA

📍 226 WATLINGTON INDUSTRIAL DRIVE, REIDSVILLE, NC 27320🏭 Industry Sector 00📅 1996-10-18
$5,920.00
Total Penalties
26
Citations
24/100
Risk Score
318
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, BTR SEALING SYSTEMS NORTH AMERICA — a industry sector 00 facility located at 226 WATLINGTON INDUSTRIAL DRIVE, REIDSVILLE, NC 27320 — was the subject of a formal OSHA inspection that resulted in 26 citation(s) and cumulative proposed penalties of $5,920.00. The inspection case was opened on 1996-10-18.

The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

State Context: Within NC, this facility's penalty places it at the 94th percentile among 88,256 inspected facilities. The statewide average penalty is $1,699.39.

Citation Analysis: The inspection produced 26 citations spanning 9 distinct OSHA regulatory standards. The citation breakdown includes: 2 other-than-serious — The violation has a direct relationship to job safety and health but is unlikely to cause death or serious physical harm. 13 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition.

Enforcement Timeline: Citations were issued beginning October 30, 1996 with the latest abatement deadline set for August 16, 1999. Of the 26 total citations, 15 (58%) have been marked as abated in DOL records, suggesting partial progress toward required corrective actions.

Penalty Assessment: The total proposed penalty of $5,920.00 falls within OSHA's standard enforcement range and may have been adjusted through informal settlement conference procedures, penalty reduction factors, or good faith credit for demonstrated safety and health management systems.

Citation Matrix — 26 Citations
29 CFR 1910.22(a)(01)
Walking-Working Surfaces — General
Other-than-Serious
Penalty: $0.00Gravity: 01Issued: October 30, 1996Abated: ✓ Yes
29 CFR 1910.212(a)(01)
Machine Guarding — General Requirements
Other-than-Serious
Penalty: $0.00Gravity: 01Issued: October 30, 1996Abated: ✓ Yes
29 CFR 1910.95(g)(08)
Serious
Penalty: $1,635.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1910.95(g)(07)
Serious
Penalty: $0.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1910.95(k)(01)
Serious
Penalty: $0.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1904.2(a)(02)
Serious
Penalty: $0.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1910.146(c)(01)
Permit-Required Confined Spaces
Serious
Penalty: $820.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1910.147(c)(04)
Control of Hazardous Energy (Lockout/Tagout)
Serious
Penalty: $585.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1910.147(c)(06)
Control of Hazardous Energy (Lockout/Tagout)
Serious
Penalty: $0.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1910.147(c)(07)
Control of Hazardous Energy (Lockout/Tagout)
Serious
Penalty: $0.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1910.147(c)(07)
Control of Hazardous Energy (Lockout/Tagout)
Serious
Penalty: $0.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1910.151(c)
Medical Services & First Aid
Serious
Penalty: $350.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1910.212(a)(03)
Machine Guarding — General Requirements
Serious
Penalty: $1,170.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1910.305(b)(01)
Electrical — Wiring Methods & Components
Serious
Penalty: $820.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
29 CFR 1910.307(b)
Serious
Penalty: $540.00Gravity: nanIssued: June 25, 1999Abated: ✓ Yes
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
More NC Enforcement Records
IMPERIAL FOOD PRODUCTS, INC.
HAMLET, NC
$808.2K
83 cit.
SOUTHERN INVESTMENTS, LLC
REIDSVILLE, NC
$441.0K
38 cit.
CATALYTICA PHARMACEUTICALS, INC.
GREENVILLE, NC
$372.4K
73 cit.
OSCAR RENDA CONTRACTING, INC.
CONCORD, NC
$292.0K
6 cit.
JOHNSON CONTROLS BATTERY GROUP, INC.
KERNERSVILLE, NC
$284.0K
67 cit.
Other Inspected Facilities in REIDSVILLE, NC
SOUTHERN INVESTMENTS, LLC
$441.0K
38 cit.
148962 - ISOMETRICS, INC.
$26.1K
26 cit.
148963 - ISOMETRICS, INC.
$18.2K
18 cit.
158962 - AMCOR SPECIALTY CARTONS AMERICAS LLC
$17.2K
4 cit.
151141 - PELICAN HEALTH REIDSVILLE
$14.3K
8 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
After an OSHA Inspection →
Citations, appeals, and penalty negotiation steps.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Penalty Calculator →
Estimate fines by violation type, industry, and size.

Explore more: OSHA enforcement in REIDSVILLE · North Carolina data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was BTR SEALING SYSTEMS NORTH AMERICA cited for?

BTR SEALING SYSTEMS NORTH AMERICA received 26 citation(s) covering 9 distinct OSHA standards. Total proposed penalties were $5,920.00. The inspection opened on 1996-10-18.

How much was BTR SEALING SYSTEMS NORTH AMERICA fined by OSHA?

OSHA proposed penalties of $5,920.00 against BTR SEALING SYSTEMS NORTH AMERICA in REIDSVILLE, NC. Average per citation: $227.69.

Is BTR SEALING SYSTEMS NORTH AMERICA a safe workplace?

Based on enforcement records, BTR SEALING SYSTEMS NORTH AMERICA has a risk score of 24 out of 100. The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

How does this penalty compare to the industry average?

The average penalty for Industry Sector 00 facilities is $1,195.75. This facility penalty of $5,920.00 is above the industry average.