Tier 4 Systematic

STANLEY HUTCHISON JR DBA HUTCHISON SUPPLY & BLDRS

📍 107 NORTH CENTRAL AVENUE, RIDGELY, MD 21660🏭 Roofing Contractors (NAICS 238160)📅 2010-06-29
$21,525.00
Total Penalties
19
Citations
23/100
Risk Score
409
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, STANLEY HUTCHISON JR DBA HUTCHISON SUPPLY & BLDRS — a roofing contractors facility located at 107 NORTH CENTRAL AVENUE, RIDGELY, MD 21660 — was the subject of a formal OSHA inspection that resulted in 19 citation(s) and cumulative proposed penalties of $21,525.00. The inspection case was opened on 2010-06-29.

The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 2.8 per 100 full-time workers — 4% above the national average of 2.7. The sector fatality rate is 9.6 per 100,000 workers.

Industry Benchmark: The total penalty of $21,525.00 is more than 6.0× the national average of $3,609.14 for facilities in the Construction sector (NAICS 238160). This sector encompasses 532,749 inspected facilities nationwide with aggregate penalties totaling $1,922.8M.

State Context: Within MD, this facility's penalty places it at the 100th percentile among 48,269 inspected facilities. The statewide average penalty is $1,448.20.

Citation Analysis: The inspection produced 19 citations spanning 9 distinct OSHA regulatory standards. The citation breakdown includes: 14 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition. 1 other-than-serious — The violation has a direct relationship to job safety and health but is unlikely to cause death or serious physical harm.

Enforcement Timeline: Citations were issued beginning August 16, 2010 with the latest abatement deadline set for September 30, 2010. Of the 19 total citations, 0 (0%) have been marked as abated in DOL records, which may indicate ongoing compliance gaps requiring further regulatory attention.

Penalty Assessment: The cumulative penalty of $21,525.00 reflects OSHA's gravity-based penalty calculation methodology, which considers the severity of potential injury, the probability of occurrence, the employer's size, good faith, and violation history. The per-citation average of $1,132.89 falls within the standard penalty range.

The inspection of Hutchison Supply & Bldrs revealed a comprehensive collapse of safety management systems, characterized by

Industry Benchmark (MD)

This facility's $21,525 penalty is higher than 99% of all penalized companies in the NAICS 238160 industry in MD. The state average penalty for this industry is $2,771.

$2,771
State Avg
$21,525
This Facility
Citation Matrix — 19 Citations
29 CFR 1926.1060(a)
Serious
Penalty: $1,225.00Gravity: 07Issued: August 16, 2010Abated: Pending
29 CFR 1926.503(b)(01)
Fall Protection Training
Other-than-Serious
Penalty: $175.00Gravity: 01Issued: August 16, 2010Abated: Pending
29 CFR 1926.20(b)(01)
Construction Safety Training & Education
Serious
Penalty: $1,225.00Gravity: 07Issued: August 16, 2010Abated: Pending
29 CFR 1926.21(b)(02)
Safety Training & Education Programs
Serious
Penalty: $1,225.00Gravity: 07Issued: August 16, 2010Abated: Pending
29 CFR 1926.100(a)
Fall Protection (Construction)
Serious
Penalty: $1,050.00Gravity: 06Issued: August 16, 2010Abated: Pending
29 CFR 1926.102(a)(01)
Serious
Penalty: $1,050.00Gravity: 06Issued: August 16, 2010Abated: Pending
29 CFR 1926.451(b)(01)
Scaffolding Safety Requirements
Serious
Penalty: $1,225.00Gravity: 07Issued: August 16, 2010Abated: Pending
29 CFR 1926.451(b)(05)
Scaffolding Safety Requirements
Serious
Penalty: $1,225.00Gravity: 07Issued: August 16, 2010Abated: Pending
29 CFR 1926.451(c)(01)
Scaffolding Safety Requirements
Serious
Penalty: $1,225.00Gravity: 07Issued: August 16, 2010Abated: Pending
29 CFR 1926.451(f)(07)
Scaffolding Safety Requirements
Serious
Penalty: $1,225.00Gravity: 07Issued: August 16, 2010Abated: Pending
29 CFR 1926.451(g)(01)
Scaffolding Safety Requirements
Serious
Penalty: $1,225.00Gravity: 07Issued: August 16, 2010Abated: Pending
29 CFR 1926.451(h)(02)
Scaffolding Safety Requirements
Serious
Penalty: $1,050.00Gravity: 06Issued: August 16, 2010Abated: Pending
29 CFR 1926.452(c)(02)
Serious
Penalty: $1,225.00Gravity: 07Issued: August 16, 2010Abated: Pending
29 CFR 1926.454(a)
Serious
Penalty: $1,225.00Gravity: 07Issued: August 16, 2010Abated: Pending
29 CFR 1926.454(b)
Serious
Penalty: $1,050.00Gravity: 06Issued: August 16, 2010Abated: Pending
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
Local Competitor Benchmark

Comparing penalized facilities in RIDGELY, MD (Exact Industry)

STANLEY HUTCHISON JR DBA HUTCHISON SUPPLY & BLDRS (This Facility)
$21.5K
19 cit.
JNN CONSTRUCTION, INC.
$97.1K
12 cit.
LEN CONTRACTORS, INC.
$97.0K
15 cit.
A1 ROOFING & RESTORATION, LLC
$24.3K
9 cit.
More MD Enforcement Records
J. P. SMITH CO., INC.
LAUREL, MD
$910.2K
3 cit.
ALLEN FAMILY FOODS INC
HURLOCK, MD
$624.1K
149 cit.
U.S. POSTAL SERVICE/BROOKLYN SOUTH CARRIER ANNEX
BROOKLYN, MD
$270.0K
10 cit.
V.L.C. CONSTRUCTION INC.
BOWIE, MD
$146.0K
16 cit.
M&J DISMANTLING, INC
BALTIMORE, MD
$124.5K
40 cit.
Other Inspected Facilities in RIDGELY, MD
JNN CONSTRUCTION, INC.
$97.1K
12 cit.
LEN CONTRACTORS, INC.
$97.0K
15 cit.
HOWARD ROE DBA HOWARD ROES MASONRY
$31.6K
24 cit.
A1 ROOFING & RESTORATION, LLC
$24.3K
9 cit.
HANOVER FOODS CORPORATION
$22.6K
42 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
After an OSHA Inspection →
Citations, appeals, and penalty negotiation steps.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Construction Safety Data →
Industry-wide violation stats and rankings.

Explore more: OSHA enforcement in RIDGELY · Maryland data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was STANLEY HUTCHISON JR DBA HUTCHISON SUPPLY & BLDRS cited for?

STANLEY HUTCHISON JR DBA HUTCHISON SUPPLY & BLDRS received 19 citation(s) covering 9 distinct OSHA standards. Total proposed penalties were $21,525.00. The inspection opened on 2010-06-29.

How much was STANLEY HUTCHISON JR DBA HUTCHISON SUPPLY & BLDRS fined by OSHA?

OSHA proposed penalties of $21,525.00 against STANLEY HUTCHISON JR DBA HUTCHISON SUPPLY & BLDRS in RIDGELY, MD. Average per citation: $1,132.89.

Is STANLEY HUTCHISON JR DBA HUTCHISON SUPPLY & BLDRS a safe workplace?

Based on enforcement records, STANLEY HUTCHISON JR DBA HUTCHISON SUPPLY & BLDRS has a risk score of 23 out of 100. The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

How does this penalty compare to the industry average?

The average penalty for Roofing Contractors facilities is $3,609.14. This facility penalty of $21,525.00 is above the industry average.