Tier 4 Systematic

RON & BRIAN STUCCO & PLASTERING

📍 1223 S FOX DEN DR, WEST JORDAN, UT 84084🏭 Industry Sector 00📅 2002-03-04
$9,750.00
Total Penalties
10
Citations
31/100
Risk Score
319
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, RON & BRIAN STUCCO & PLASTERING — a industry sector 00 facility located at 1223 S FOX DEN DR, WEST JORDAN, UT 84084 — was the subject of a formal OSHA inspection that resulted in 10 citation(s) and cumulative proposed penalties of $9,750.00. The inspection case was opened on 2002-03-04.

The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

State Context: Within UT, this facility's penalty places it at the 98th percentile among 21,375 inspected facilities. The statewide average penalty is $1,557.94.

Citation Analysis: The inspection produced 10 citations spanning 2 distinct OSHA regulatory standards. The citation breakdown includes: 7 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition. 3 repeat — A substantially similar violation was found during a previous inspection and the original citation has become a final order.

Enforcement Timeline: Citations were issued beginning April 8, 2002 with the latest abatement deadline set for April 12, 2002. Of the 10 total citations, 10 (100%) have been marked as abated in DOL records, indicating substantial compliance with corrective action requirements.

Penalty Assessment: The total proposed penalty of $9,750.00 falls within OSHA's standard enforcement range and may have been adjusted through informal settlement conference procedures, penalty reduction factors, or good faith credit for demonstrated safety and health management systems.

Citation Matrix — 10 Citations
OSHA Std. 10005 E07
Serious
Penalty: $1,375.00Gravity: nanIssued: April 8, 2002Abated: ✓ Yes
29 CFR 1926.451(b)(08)
Scaffolding Safety Requirements
Serious
Penalty: $1,375.00Gravity: nanIssued: April 8, 2002Abated: ✓ Yes
29 CFR 1926.451(c)(02)
Scaffolding Safety Requirements
Serious
Penalty: $0.00Gravity: nanIssued: April 8, 2002Abated: ✓ Yes
29 CFR 1926.451(c)(03)
Scaffolding Safety Requirements
Serious
Penalty: $0.00Gravity: nanIssued: April 8, 2002Abated: ✓ Yes
29 CFR 1926.451(e)(01)
Scaffolding Safety Requirements
Serious
Penalty: $0.00Gravity: nanIssued: April 8, 2002Abated: ✓ Yes
29 CFR 1926.451(f)(01)
Scaffolding Safety Requirements
Serious
Penalty: $0.00Gravity: nanIssued: April 8, 2002Abated: ✓ Yes
29 CFR 1926.454(a)
Serious
Penalty: $1,375.00Gravity: nanIssued: April 8, 2002Abated: ✓ Yes
29 CFR 1926.451(b)(01)
Scaffolding Safety Requirements
Repeat
Penalty: $1,875.00Gravity: nanIssued: April 8, 2002Abated: ✓ Yes
29 CFR 1926.451(f)(03)
Scaffolding Safety Requirements
Repeat
Penalty: $1,875.00Gravity: nanIssued: April 8, 2002Abated: ✓ Yes
29 CFR 1926.451(g)(04)
Scaffolding Safety Requirements
Repeat
Penalty: $1,875.00Gravity: nanIssued: April 8, 2002Abated: ✓ Yes
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
More UT Enforcement Records
US MAGNESIUM LLC
GRANTSVILLE, UT
$1.2M
72 cit.
SILVER EAGLE REFINING INC
WOODS CROSS, UT
$584.5K
75 cit.
GENEVA STEEL
OREM, UT
$252.6K
215 cit.
KENNECOTT UTAH COPPER
MAGNA, UT
$239.4K
58 cit.
DEL RAY JACKSON CONSTRUCTION
ST GEORGE, UT
$213.5K
12 cit.
Other Inspected Facilities in WEST JORDAN, UT
BRC CONTRACTORS INC
$69.0K
5 cit.
SCR EXCAVATION
$19.6K
6 cit.
SHAW STUCCO & GENERAL CONTRACTING
$18.0K
6 cit.
TROJAN ROOFING
$14.5K
4 cit.
XTREME CONTRACTING LLC
$14.0K
1 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
After an OSHA Inspection →
Citations, appeals, and penalty negotiation steps.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Penalty Calculator →
Estimate fines by violation type, industry, and size.

Explore more: OSHA enforcement in WEST JORDAN · Utah data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was RON & BRIAN STUCCO & PLASTERING cited for?

RON & BRIAN STUCCO & PLASTERING received 10 citation(s) covering 2 distinct OSHA standards. Total proposed penalties were $9,750.00. The inspection opened on 2002-03-04.

How much was RON & BRIAN STUCCO & PLASTERING fined by OSHA?

OSHA proposed penalties of $9,750.00 against RON & BRIAN STUCCO & PLASTERING in WEST JORDAN, UT. Average per citation: $975.00.

Is RON & BRIAN STUCCO & PLASTERING a safe workplace?

Based on enforcement records, RON & BRIAN STUCCO & PLASTERING has a risk score of 31 out of 100. The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

How does this penalty compare to the industry average?

The average penalty for Industry Sector 00 facilities is $1,195.75. This facility penalty of $9,750.00 is above the industry average.