RFX2024XRS480X0132 - MARRS CONSTRUCTION, INC.

📍 15000 W INDIAN SCHOOL ROAD, GOODYEAR, AZ 85395🏭 Water and Sewer Line and Related Structures Construction (NAICS 237110)📅 2024-07-26
$61,468.00
Total Penalties
3
Citations
28/100
Risk Score
404
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, RFX2024XRS480X0132 - MARRS CONSTRUCTION, INC. — a water and sewer line and related structures construction facility located at 15000 W INDIAN SCHOOL ROAD, GOODYEAR, AZ 85395 — was the subject of a formal OSHA inspection that resulted in 3 citation(s) and cumulative proposed penalties of $61,468.00. The inspection case was opened on 2024-07-26.

Cumulative penalties significantly exceed the national median for OSHA enforcement actions. The penalty amount suggests multiple high-gravity citations, indicating conditions that presented a substantial probability of death or serious physical harm to employees.

BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 2.8 per 100 full-time workers — 4% above the national average of 2.7. The sector fatality rate is 9.6 per 100,000 workers.

Industry Benchmark: The total penalty of $61,468.00 is more than 17.0× the national average of $3,609.14 for facilities in the Construction sector (NAICS 237110). This sector encompasses 532,749 inspected facilities nationwide with aggregate penalties totaling $1,922.8M.

State Context: Within AZ, this facility's penalty places it at the 100th percentile among 28,263 inspected facilities. The statewide average penalty is $1,378.92.

Citation Analysis: The inspection produced 3 citations spanning 3 distinct OSHA regulatory standards. The citation breakdown includes: 2 repeat — A substantially similar violation was found during a previous inspection and the original citation has become a final order. 1 other-than-serious — The violation has a direct relationship to job safety and health but is unlikely to cause death or serious physical harm.

Enforcement Timeline: Citations were issued beginning January 23, 2025 with the latest abatement deadline set for January 26, 2025. Of the 3 total citations, 0 (0%) have been marked as abated in DOL records, which may indicate ongoing compliance gaps requiring further regulatory attention.

Penalty Assessment: The per-citation average of $20,489.33 exceeds OSHA's FY2024 statutory maximum of $16,131 for serious violations, indicating the presence of willful or repeat classifications that carry enhanced penalty authority under Section 17 of the OSH Act.

Marrs Construction, Inc.’s enforcement record reveals a pattern of systemic negligence regarding excavation safety, characterized

Industry Benchmark (AZ)

This facility's $61,468 penalty is higher than 99% of all penalized companies in the NAICS 237110 industry in AZ. The state average penalty for this industry is $5,984.

$5,984
State Avg
$61,468
This Facility
Citation Matrix — 3 Citations
29 CFR 1926.652(a)(01)
Repeat
Penalty: $16,134.00Gravity: nanIssued: January 23, 2025Abated: Pending
29 CFR 1926.651(i)(03)
Repeat
Penalty: $40,334.00Gravity: nanIssued: January 23, 2025Abated: Pending
29 CFR 1904.39(a)(02)
Other-than-Serious
Penalty: $5,000.00Gravity: nanIssued: January 23, 2025Abated: Pending
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
Local Competitor Benchmark

Comparing penalized facilities in GOODYEAR, AZ (Exact Industry)

RFX2024XRS480X0132 - MARRS CONSTRUCTION, INC. (This Facility)
$61.5K
3 cit.
ARIZONA'S VALLEY UNDERGROUND LLC
$31.0K
7 cit.
PIPELINE DYNAMICS, INC.
$2.8K
2 cit.
RIGGS ENGINEERING, INC.
$2.5K
1 cit.
More AZ Enforcement Records
ARIZONA STATE FORESTRY DIVISION
YARNELL, AZ
$559.0K
3 cit.
AGATE, INC.
SCOTTSDALE, AZ
$431.5K
14 cit.
PACIFIC PAINTING & CONSTRUCTION
26963446LD, AZ
$354.3K
69 cit.
ARIZONA FEEDS COUNTRY STORE
TUCSON, AZ
$322.0K
16 cit.
QUEST AEROSPACE
SOMERTON, AZ
$217.7K
16 cit.
Other Inspected Facilities in GOODYEAR, AZ
FCX2025XTN246X0041 - C S CONSTRUCTION, INC.
$33.1K
2 cit.
CAVCO INDUSTRIES, INC.
$32.7K
68 cit.
ARIZONA'S VALLEY UNDERGROUND LLC
$31.0K
7 cit.
PROGRESSIVE ROOFING
$21.0K
4 cit.
CHASSE BUILDING TEAM, INC.
$21.0K
3 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
After an OSHA Inspection →
Citations, appeals, and penalty negotiation steps.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Construction Safety Data →
Industry-wide violation stats and rankings.

Explore more: OSHA enforcement in GOODYEAR · Arizona data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was RFX2024XRS480X0132 - MARRS CONSTRUCTION, INC. cited for?

RFX2024XRS480X0132 - MARRS CONSTRUCTION, INC. received 3 citation(s) covering 3 distinct OSHA standards. Total proposed penalties were $61,468.00. The inspection opened on 2024-07-26.

How much was RFX2024XRS480X0132 - MARRS CONSTRUCTION, INC. fined by OSHA?

OSHA proposed penalties of $61,468.00 against RFX2024XRS480X0132 - MARRS CONSTRUCTION, INC. in GOODYEAR, AZ. Average per citation: $20,489.33.

Is RFX2024XRS480X0132 - MARRS CONSTRUCTION, INC. a safe workplace?

Based on enforcement records, RFX2024XRS480X0132 - MARRS CONSTRUCTION, INC. has a risk score of 28 out of 100. Cumulative penalties significantly exceed the national median for OSHA enforcement actions. The penalty amount suggests multiple high-gravity citations, indicating conditions that presented a substantial probability of death or serious physical harm to employees.

How does this penalty compare to the industry average?

The average penalty for Water and Sewer Line and Related Structures Construction facilities is $3,609.14. This facility penalty of $61,468.00 is above the industry average.