Tier 4 Systematic

JULIO C TIRADO

📍 16201 W. 87TH ST. PARKWAY, LENEXA, KS 66219🏭 Masonry Contractors (NAICS 238140)📅 2022-10-25
$35,429.00
Total Penalties
11
Citations
22/100
Risk Score
385
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, JULIO C TIRADO — a masonry contractors facility located at 16201 W. 87TH ST. PARKWAY, LENEXA, KS 66219 — was the subject of a formal OSHA inspection that resulted in 11 citation(s) and cumulative proposed penalties of $35,429.00. The inspection case was opened on 2022-10-25.

The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 2.8 per 100 full-time workers — 4% above the national average of 2.7. The sector fatality rate is 9.6 per 100,000 workers.

Industry Benchmark: The total penalty of $35,429.00 is more than 9.8× the national average of $3,609.14 for facilities in the Construction sector (NAICS 238140). This sector encompasses 532,749 inspected facilities nationwide with aggregate penalties totaling $1,922.8M.

State Context: Within KS, this facility's penalty places it at the 99th percentile among 19,826 inspected facilities. The statewide average penalty is $3,225.89.

Citation Analysis: The inspection produced 11 citations spanning 6 distinct OSHA regulatory standards. The citation breakdown includes: 11 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition.

Enforcement Timeline: Citations were issued beginning January 4, 2023 with the latest abatement deadline set for January 31, 2023. Of the 11 total citations, 0 (0%) have been marked as abated in DOL records, which may indicate ongoing compliance gaps requiring further regulatory attention.

Penalty Assessment: The cumulative penalty of $35,429.00 reflects OSHA's gravity-based penalty calculation methodology, which considers the severity of potential injury, the probability of occurrence, the employer's size, good faith, and violation history. The per-citation average of $3,220.82 falls within the standard penalty range.

The enforcement record for Julio C. Tirado reveals a systemic collapse of safety management systems typical of high

Industry Benchmark (KS)

This facility's $35,429 penalty is higher than 99% of all penalized companies in the NAICS 238140 industry in KS. The state average penalty for this industry is $4,907.

$4,907
State Avg
$35,429
This Facility
Citation Matrix — 11 Citations
29 CFR 1910.1200(e)(01)
Hazard Communication Standard (Chemical Safety)
Serious
Penalty: $2,486.00Gravity: 5Issued: January 4, 2023Abated: Pending
29 CFR 1910.1200(g)(01)
Hazard Communication Standard (Chemical Safety)
Serious
Penalty: $2,486.00Gravity: 5Issued: January 4, 2023Abated: Pending
29 CFR 1910.1200(h)(01)
Hazard Communication Standard (Chemical Safety)
Serious
Penalty: $2,486.00Gravity: 5Issued: January 4, 2023Abated: Pending
29 CFR 1926.102(a)(01)
Serious
Penalty: $2,486.00Gravity: 5Issued: January 4, 2023Abated: Pending
29 CFR 1926.403(b)(01)
Serious
Penalty: $1,865.00Gravity: 1Issued: January 4, 2023Abated: Pending
29 CFR 1926.451(e)(01)
Scaffolding Safety Requirements
Serious
Penalty: $3,108.00Gravity: 5Issued: January 4, 2023Abated: Pending
29 CFR 1926.451(f)(07)
Scaffolding Safety Requirements
Serious
Penalty: $4,351.00Gravity: 10Issued: January 4, 2023Abated: Pending
29 CFR 1926.451(g)(04)
Scaffolding Safety Requirements
Serious
Penalty: $4,351.00Gravity: 10Issued: January 4, 2023Abated: Pending
29 CFR 1926.452(c)(02)
Serious
Penalty: $4,351.00Gravity: 10Issued: January 4, 2023Abated: Pending
29 CFR 1926.452(c)(03)
Serious
Penalty: $4,351.00Gravity: 10Issued: January 4, 2023Abated: Pending
29 CFR 1926.454(a)
Serious
Penalty: $3,108.00Gravity: 5Issued: January 4, 2023Abated: Pending
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
Local Competitor Benchmark

Comparing penalized facilities in LENEXA, KS (Exact Industry)

JULIO C TIRADO (This Facility)
$35.4K
11 cit.
VISION MASONARY LLC
$16.0K
7 cit.
HG CONSTRUCTION
$15.8K
5 cit.
LEONARDO CASTILLO
$15.7K
6 cit.
More KS Enforcement Records
DEBRUCE GRAIN ELEVATOR
WICHITA, KS
$2.0M
53 cit.
NATIONAL BEEF PACKING CO. LP
LIBERAL, KS
$1.5M
194 cit.
WESTERN RESOURCES, INC
LAWRENCE, KS
$415.0K
27 cit.
GAVILON GRAIN, LLC
WICHITA, KS
$369.0K
15 cit.
MONFORT, INC.
GARDEN CITY, KS
$334.3K
82 cit.
Other Inspected Facilities in LENEXA, KS
ROGER MEJIA
$176.0K
14 cit.
RF CONSTRUCTION SERVICES
$58.5K
5 cit.
UNITED ROTARY BRUSH CORPORATION
$43.0K
16 cit.
GRANITE CENTERS INC
$34.7K
12 cit.
LENIN SALAS
$28.3K
5 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
After an OSHA Inspection →
Citations, appeals, and penalty negotiation steps.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Construction Safety Data →
Industry-wide violation stats and rankings.

Explore more: OSHA enforcement in LENEXA · Kansas data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was JULIO C TIRADO cited for?

JULIO C TIRADO received 11 citation(s) covering 6 distinct OSHA standards. Total proposed penalties were $35,429.00. The inspection opened on 2022-10-25.

How much was JULIO C TIRADO fined by OSHA?

OSHA proposed penalties of $35,429.00 against JULIO C TIRADO in LENEXA, KS. Average per citation: $3,220.82.

Is JULIO C TIRADO a safe workplace?

Based on enforcement records, JULIO C TIRADO has a risk score of 22 out of 100. The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

How does this penalty compare to the industry average?

The average penalty for Masonry Contractors facilities is $3,609.14. This facility penalty of $35,429.00 is above the industry average.