Tier 4 Systematic

JOSE RAMIREZ DBA RB PLASTERING

📍 508 SUNNY LANE, AUSTIN, TX 78704🏭 Drywall and Insulation Contractors (NAICS 238310)📅 2010-11-24
$19,800.00
Total Penalties
16
Citations
36/100
Risk Score
427
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, JOSE RAMIREZ DBA RB PLASTERING — a drywall and insulation contractors facility located at 508 SUNNY LANE, AUSTIN, TX 78704 — was the subject of a formal OSHA inspection that resulted in 16 citation(s) and cumulative proposed penalties of $19,800.00. The inspection case was opened on 2010-11-24.

The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 2.8 per 100 full-time workers — 4% above the national average of 2.7. The sector fatality rate is 9.6 per 100,000 workers.

Industry Benchmark: The total penalty of $19,800.00 is more than 5.5× the national average of $3,609.14 for facilities in the Construction sector (NAICS 238310). This sector encompasses 532,749 inspected facilities nationwide with aggregate penalties totaling $1,922.8M.

State Context: Within TX, this facility's penalty places it at the 98th percentile among 119,485 inspected facilities. The statewide average penalty is $3,783.80.

Citation Analysis: The inspection produced 16 citations spanning 7 distinct OSHA regulatory standards. The citation breakdown includes: 8 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition. 6 repeat — A substantially similar violation was found during a previous inspection and the original citation has become a final order. 1 other-than-serious — The violation has a direct relationship to job safety and health but is unlikely to cause death or serious physical harm.

Enforcement Timeline: Citations were issued beginning May 11, 2011 with the latest abatement deadline set for May 27, 2011. Of the 16 total citations, 15 (94%) have been marked as abated in DOL records, indicating substantial compliance with corrective action requirements.

Penalty Assessment: The cumulative penalty of $19,800.00 reflects OSHA's gravity-based penalty calculation methodology, which considers the severity of potential injury, the probability of occurrence, the employer's size, good faith, and violation history. The per-citation average of $1,237.50 falls within the standard penalty range.

The enforcement record for RB Plastering reveals a systemic and alarming disregard for fundamental fall protection and scaffolding safety

Industry Benchmark (TX)

This facility's $19,800 penalty is higher than 98% of all penalized companies in the NAICS 238310 industry in TX. The state average penalty for this industry is $4,276.

$4,276
State Avg
$19,800
This Facility
Citation Matrix — 16 Citations
29 CFR 1926.20(b)(01)
Construction Safety Training & Education
Serious
Penalty: $710.00Gravity: 10Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.20(b)(02)
Construction Safety Training & Education
Serious
Penalty: $0.00Gravity: 10Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.25(a)
Serious
Penalty: $720.00Gravity: 05Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.451(b)(02)
Scaffolding Safety Requirements
Serious
Penalty: $720.00Gravity: 10Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.451(c)(01)
Scaffolding Safety Requirements
Serious
Penalty: $720.00Gravity: 10Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.451(e)(01)
Scaffolding Safety Requirements
Serious
Penalty: $720.00Gravity: 10Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.451(h)(02)
Scaffolding Safety Requirements
Serious
Penalty: $720.00Gravity: 05Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.503(a)(01)
Fall Protection Training
Serious
Penalty: $720.00Gravity: 10Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.100(a)
Fall Protection (Construction)
Repeat
Penalty: $2,000.00Gravity: 05Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.451(b)(01)
Scaffolding Safety Requirements
Repeat
Penalty: $2,000.00Gravity: 10Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.451(c)(02)
Scaffolding Safety Requirements
Repeat
Penalty: $2,000.00Gravity: 03Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.501(b)(01)
Fall Protection Scope & Applications (Construction)
Repeat
Penalty: $2,000.00Gravity: 10Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.1053(b)(01)
Ladders (Construction)
Repeat
Penalty: $2,000.00Gravity: 05Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.451(f)(03)
Scaffolding Safety Requirements
Other-than-Serious
Penalty: $770.00Gravity: 03Issued: May 11, 2011Abated: ✓ Yes
29 CFR 1926.451(g)(01)
Scaffolding Safety Requirements
Repeat
Penalty: $2,000.00Gravity: 10Issued: May 11, 2011Abated: ✓ Yes
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
Local Competitor Benchmark

Comparing penalized facilities in AUSTIN, TX (Exact Industry)

JOSE RAMIREZ DBA RB PLASTERING (This Facility)
$19.8K
16 cit.
SAN ANTONIO LATH & PLASTER
$83.1K
18 cit.
CAPOERA CONSTRUCTION LLC
$36.4K
6 cit.
CARLOS CRUZ
$23.5K
7 cit.
More TX Enforcement Records
BP PRODUCTS NORTH AMERICA, INC.
TEXAS CITY, TX
$38.1M
1215 cit.
PHILLIPS 66 COMPANY,HOUSTON CHEMICAL COMPLEX
PASADENA, TX
$4.0M
612 cit.
ARCO CHEMICAL CO.
CHANNELVIEW, TX
$3.5M
367 cit.
PHILLIPS PETROLEUM CO.
PASADENA, TX
$2.2M
52 cit.
WYMAN-GORDON FORGINGS, LP
HOUSTON, TX
$1.9M
96 cit.
Other Inspected Facilities in AUSTIN, TX
MICHAEL ANGELO'S GOURMET FOODS, INC.
$354.3K
166 cit.
LIQUID ENVIRONMENTAL SOLUTIONS OF TEXAS, LLC.
$287.9K
4 cit.
CAVCO INDUSTRIES INC.
$212.1K
28 cit.
CIRCLE K STORES INC
$165.4K
10 cit.
D GUERRA CONSTRUCTION LLC
$140.0K
5 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
After an OSHA Inspection →
Citations, appeals, and penalty negotiation steps.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Construction Safety Data →
Industry-wide violation stats and rankings.

Explore more: OSHA enforcement in AUSTIN · Texas data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was JOSE RAMIREZ DBA RB PLASTERING cited for?

JOSE RAMIREZ DBA RB PLASTERING received 16 citation(s) covering 7 distinct OSHA standards. Total proposed penalties were $19,800.00. The inspection opened on 2010-11-24.

How much was JOSE RAMIREZ DBA RB PLASTERING fined by OSHA?

OSHA proposed penalties of $19,800.00 against JOSE RAMIREZ DBA RB PLASTERING in AUSTIN, TX. Average per citation: $1,237.50.

Is JOSE RAMIREZ DBA RB PLASTERING a safe workplace?

Based on enforcement records, JOSE RAMIREZ DBA RB PLASTERING has a risk score of 36 out of 100. The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

How does this penalty compare to the industry average?

The average penalty for Drywall and Insulation Contractors facilities is $3,609.14. This facility penalty of $19,800.00 is above the industry average.