Tier 5 Standard

JERRY PURDON

📍 503 TIGER DRIVE, BATESVILLE, MS 38606🏭 Structural Steel and Precast Concrete Contractors (NAICS 238120)📅 2018-12-13
$10,608.00
Total Penalties
4
Citations
4/100
Risk Score
394
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, JERRY PURDON — a structural steel and precast concrete contractors facility located at 503 TIGER DRIVE, BATESVILLE, MS 38606 — was the subject of a formal OSHA inspection that resulted in 4 citation(s) and cumulative proposed penalties of $10,608.00. The inspection case was opened on 2018-12-13.

DOL records document workplace safety violations warranting formal citation under the OSH Act. While classified at the standard enforcement level, all OSHA citations require corrective action and may indicate areas where workplace safety programs should be strengthened.

BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 2.8 per 100 full-time workers — 4% above the national average of 2.7. The sector fatality rate is 9.6 per 100,000 workers.

Industry Benchmark: The total penalty of $10,608.00 is more than 2.9× the national average of $3,609.14 for facilities in the Construction sector (NAICS 238120). This sector encompasses 532,749 inspected facilities nationwide with aggregate penalties totaling $1,922.8M.

State Context: Within MS, this facility's penalty places it at the 95th percentile among 15,959 inspected facilities. The statewide average penalty is $2,620.02.

Citation Analysis: The inspection produced 4 citations spanning 4 distinct OSHA regulatory standards. The citation breakdown includes: 3 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition. 1 other-than-serious — The violation has a direct relationship to job safety and health but is unlikely to cause death or serious physical harm.

Enforcement Timeline: Citations were issued beginning March 22, 2019 with the latest abatement deadline set for April 15, 2019. Of the 4 total citations, 0 (0%) have been marked as abated in DOL records, which may indicate ongoing compliance gaps requiring further regulatory attention.

Penalty Assessment: The cumulative penalty of $10,608.00 reflects OSHA's gravity-based penalty calculation methodology, which considers the severity of potential injury, the probability of occurrence, the employer's size, good faith, and violation history. The per-citation average of $2,652.00 falls within the standard penalty range.

Industry Benchmark (MS)

This facility's $10,608 penalty is higher than 96% of all penalized companies in the NAICS 238120 industry in MS. The state average penalty for this industry is $3,779.

$3,779
State Avg
$10,608
This Facility
Citation Matrix — 4 Citations
29 CFR 1926.100(a)
Fall Protection (Construction)
Serious
Penalty: $2,273.00Gravity: 1Issued: March 22, 2019Abated: Pending
29 CFR 1926.760(a)(01)
Serious
Penalty: $5,304.00Gravity: 10Issued: March 22, 2019Abated: Pending
29 CFR 1926.761(b)
Serious
Penalty: $3,031.00Gravity: 5Issued: March 22, 2019Abated: Pending
29 CFR 1926.20(b)(01)
Construction Safety Training & Education
Other-than-Serious
Penalty: $0.00Gravity: nanIssued: March 22, 2019Abated: Pending
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
Local Competitor Benchmark

Comparing penalized facilities in BATESVILLE, MS (Exact Industry)

JERRY PURDON (This Facility)
$10.6K
4 cit.
HARRELL'S METAL WORKS, INC.
$1.4K
1 cit.
HOPPER STEEL, INC.
$1.2K
1 cit.
JIJI CONSTRUCTION LLC
$870
1 cit.
More MS Enforcement Records
VT HALTER MARINE, INC.
ESCATAWPA, MS
$1.3M
44 cit.
JINDAL TUBULAR USA LLC
BAY SAINT LOUIS, MS
$486.5K
35 cit.
INTERNATIONAL PAPER COMPANY
MOSS POINT, MS
$429.6K
93 cit.
PARKER HANNIFIN CORPORATION
BATESVILLE, MS
$339.6K
38 cit.
HUNTINGTON INGALLS INCORPORATED
PASCAGOULA, MS
$285.6K
190 cit.
Other Inspected Facilities in BATESVILLE, MS
PARKER HANNIFIN CORPORATION
$339.6K
38 cit.
ART HORIZONS, INC.
$47.0K
29 cit.
FRAMED PICTURE ENTERPRISE
$17.7K
47 cit.
ACI BUILDING SYSTEMS, LLC
$16.9K
5 cit.
FRAMED PICTURE ENTERPRISE, INC.
$14.0K
20 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
After an OSHA Inspection →
Citations, appeals, and penalty negotiation steps.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Construction Safety Data →
Industry-wide violation stats and rankings.

Explore more: OSHA enforcement in BATESVILLE · Mississippi data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was JERRY PURDON cited for?

JERRY PURDON received 4 citation(s) covering 4 distinct OSHA standards. Total proposed penalties were $10,608.00. The inspection opened on 2018-12-13.

How much was JERRY PURDON fined by OSHA?

OSHA proposed penalties of $10,608.00 against JERRY PURDON in BATESVILLE, MS. Average per citation: $2,652.00.

Is JERRY PURDON a safe workplace?

Based on enforcement records, JERRY PURDON has a risk score of 4 out of 100. DOL records document workplace safety violations warranting formal citation under the OSH Act. While classified at the standard enforcement level, all OSHA citations require corrective action and may indicate areas where workplace safety programs should be strengthened.

How does this penalty compare to the industry average?

The average penalty for Structural Steel and Precast Concrete Contractors facilities is $3,609.14. This facility penalty of $10,608.00 is above the industry average.