Tier 5 Standard

G.R. BIRDWELL CONSTRUCTION, LP

📍 15602 SAN JACINTO PORT, CHANNELVIEW, TX 77530🏭 Poured Concrete Foundation and Structure Contractors (NAICS 238110)📅 2012-09-21
$6,300.00
Total Penalties
1
Citations
1/100
Risk Score
371
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, G.R. BIRDWELL CONSTRUCTION, LP — a poured concrete foundation and structure contractors facility located at 15602 SAN JACINTO PORT, CHANNELVIEW, TX 77530 — was the subject of a formal OSHA inspection that resulted in 1 citation(s) and cumulative proposed penalties of $6,300.00. The inspection case was opened on 2012-09-21.

DOL records document workplace safety violations warranting formal citation under the OSH Act. While classified at the standard enforcement level, all OSHA citations require corrective action and may indicate areas where workplace safety programs should be strengthened.

BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 2.8 per 100 full-time workers — 4% above the national average of 2.7. The sector fatality rate is 9.6 per 100,000 workers.

Industry Benchmark: The total penalty of $6,300.00 is 75% above the national average of $3,609.14 for facilities in the Construction sector (NAICS 238110). This sector encompasses 532,749 inspected facilities nationwide with aggregate penalties totaling $1,922.8M.

State Context: Within TX, this facility's penalty places it at the 87th percentile among 119,485 inspected facilities. The statewide average penalty is $3,783.80.

Citation Analysis: The inspection produced 1 citations spanning 0 distinct OSHA regulatory standards. The citation breakdown includes: 1 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition.

Enforcement Timeline: Citations were issued beginning November 13, 2012 with the latest abatement deadline set for November 19, 2012. Of the 1 total citations, 0 (0%) have been marked as abated in DOL records, which may indicate ongoing compliance gaps requiring further regulatory attention.

Penalty Assessment: The total proposed penalty of $6,300.00 falls within OSHA's standard enforcement range and may have been adjusted through informal settlement conference procedures, penalty reduction factors, or good faith credit for demonstrated safety and health management systems.

Industry Benchmark (TX)

This facility's $6,300 penalty is higher than 82% of all penalized companies in the NAICS 238110 industry in TX. The state average penalty for this industry is $4,344.

$4,344
State Avg
$6,300
This Facility
Citation Matrix — 1 Citations
OSHA Std. 5A0001
Serious
Penalty: $6,300.00Gravity: 10Issued: November 13, 2012Abated: Pending
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
Local Competitor Benchmark

Comparing penalized facilities in CHANNELVIEW, TX (Broader Sector)

G.R. BIRDWELL CONSTRUCTION, LP (This Facility)
$6.3K
1 cit.
ZACHRY INDUSTRIAL, INC.
$12.3K
1 cit.
LUIS FLORES
$6.7K
2 cit.
RUS INDUSTRIAL LLC
$6.0K
4 cit.
More TX Enforcement Records
BP PRODUCTS NORTH AMERICA, INC.
TEXAS CITY, TX
$38.1M
1215 cit.
PHILLIPS 66 COMPANY,HOUSTON CHEMICAL COMPLEX
PASADENA, TX
$4.0M
612 cit.
ARCO CHEMICAL CO.
CHANNELVIEW, TX
$3.5M
367 cit.
PHILLIPS PETROLEUM CO.
PASADENA, TX
$2.2M
52 cit.
WYMAN-GORDON FORGINGS, LP
HOUSTON, TX
$1.9M
96 cit.
Other Inspected Facilities in CHANNELVIEW, TX
ARCO CHEMICAL CO.
$3.5M
367 cit.
SNEED SHIPBUILDING, INC.
$140.7K
76 cit.
SOLAR TURBINES, INC., TURBOFAB FACILITY
$115.1K
54 cit.
SOUTHWEST SHIPYARD, L.P.
$86.1K
51 cit.
LAIDLAW ENVIRONMENTAL SERVICES INC
$66.9K
18 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
After an OSHA Inspection →
Citations, appeals, and penalty negotiation steps.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Construction Safety Data →
Industry-wide violation stats and rankings.

Explore more: OSHA enforcement in CHANNELVIEW · Texas data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was G.R. BIRDWELL CONSTRUCTION, LP cited for?

G.R. BIRDWELL CONSTRUCTION, LP received 1 citation(s) covering 0 distinct OSHA standards. Total proposed penalties were $6,300.00. The inspection opened on 2012-09-21.

How much was G.R. BIRDWELL CONSTRUCTION, LP fined by OSHA?

OSHA proposed penalties of $6,300.00 against G.R. BIRDWELL CONSTRUCTION, LP in CHANNELVIEW, TX. Average per citation: $6,300.00.

Is G.R. BIRDWELL CONSTRUCTION, LP a safe workplace?

Based on enforcement records, G.R. BIRDWELL CONSTRUCTION, LP has a risk score of 1 out of 100. DOL records document workplace safety violations warranting formal citation under the OSH Act. While classified at the standard enforcement level, all OSHA citations require corrective action and may indicate areas where workplace safety programs should be strengthened.

How does this penalty compare to the industry average?

The average penalty for Poured Concrete Foundation and Structure Contractors facilities is $3,609.14. This facility penalty of $6,300.00 is above the industry average.