Tier 4 Systematic

F CARUSO CONSTRUCTION, INC.

📍 39 CEDAR SWAMP RD, GLEN COVE, NY 11542🏭 Industry Sector 00📅 1996-03-13
$7,050.00
Total Penalties
10
Citations
16/100
Risk Score
321
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, F CARUSO CONSTRUCTION, INC. — a industry sector 00 facility located at 39 CEDAR SWAMP RD, GLEN COVE, NY 11542 — was the subject of a formal OSHA inspection that resulted in 10 citation(s) and cumulative proposed penalties of $7,050.00. The inspection case was opened on 1996-03-13.

The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

State Context: Within NY, this facility's penalty places it at the 93th percentile among 140,736 inspected facilities. The statewide average penalty is $2,208.33.

Citation Analysis: The inspection produced 10 citations spanning 5 distinct OSHA regulatory standards. The citation breakdown includes: 3 other-than-serious — The violation has a direct relationship to job safety and health but is unlikely to cause death or serious physical harm. 7 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition.

Enforcement Timeline: Citations were issued beginning August 9, 1996 with the latest abatement deadline set for September 26, 1996. Of the 10 total citations, 4 (40%) have been marked as abated in DOL records, which may indicate ongoing compliance gaps requiring further regulatory attention.

Penalty Assessment: The total proposed penalty of $7,050.00 falls within OSHA's standard enforcement range and may have been adjusted through informal settlement conference procedures, penalty reduction factors, or good faith credit for demonstrated safety and health management systems.

Citation Matrix — 10 Citations
29 CFR 1910.1200(g)(01)
Hazard Communication Standard (Chemical Safety)
Other-than-Serious
Penalty: $0.00Gravity: 01Issued: August 9, 1996Abated: ✓ Yes
29 CFR 1910.1200(h)
Hazard Communication Standard (Chemical Safety)
Other-than-Serious
Penalty: $0.00Gravity: 01Issued: August 9, 1996Abated: ✓ Yes
29 CFR 1926.21(b)(02)
Safety Training & Education Programs
Serious
Penalty: $600.00Gravity: 02Issued: August 9, 1996Abated: ✓ Yes
29 CFR 1926.100(a)
Fall Protection (Construction)
Serious
Penalty: $1,050.00Gravity: 05Issued: August 9, 1996Abated: Pending
29 CFR 1926.416(g)(02)
Electrical Safety (Construction)
Serious
Penalty: $2,100.00Gravity: 10Issued: August 9, 1996Abated: Pending
29 CFR 1926.416(g)(02)
Electrical Safety (Construction)
Serious
Penalty: $0.00Gravity: 10Issued: August 9, 1996Abated: Pending
29 CFR 1926.451(a)(13)
Scaffolding Safety Requirements
Serious
Penalty: $600.00Gravity: 02Issued: August 9, 1996Abated: Pending
29 CFR 1926.451(d)(03)
Scaffolding Safety Requirements
Serious
Penalty: $600.00Gravity: 02Issued: August 9, 1996Abated: Pending
29 CFR 1926.451(d)(10)
Scaffolding Safety Requirements
Serious
Penalty: $2,100.00Gravity: 10Issued: August 9, 1996Abated: Pending
29 CFR 1910.1200(e)(01)
Hazard Communication Standard (Chemical Safety)
Other-than-Serious
Penalty: $0.00Gravity: 01Issued: August 9, 1996Abated: ✓ Yes
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
More NY Enforcement Records
ALJ HOME IMPROVEMENT INC
SPRING VALLEY, NY
$1.3M
12 cit.
FRAZER & JONES, LLC
SYRACUSE, NY
$1.0M
34 cit.
DME CONSTRUCTION ASSOCIATES INC.
OLD BETHPAGE, NY
$600.0K
13 cit.
MC WANE, INC. DBA KENNEDY VALVE
ELMIRA, NY
$575.4K
204 cit.
ELITE ROOFING SERVICES, INC.
GLEN COVE, NY
$522.5K
7 cit.
Other Inspected Facilities in GLEN COVE, NY
ELITE ROOFING SERVICES, INC.
$522.5K
7 cit.
KONICA IMAGING USA INC.
$74.6K
67 cit.
MONTENAY GLEN COVE CORP.
$65.4K
138 cit.
PHOTOCIRCUITS CORPORATION
$55.8K
64 cit.
LONG ISLAND PAINT COMPANY
$38.3K
83 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
After an OSHA Inspection →
Citations, appeals, and penalty negotiation steps.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Penalty Calculator →
Estimate fines by violation type, industry, and size.

Explore more: OSHA enforcement in GLEN COVE · New York data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was F CARUSO CONSTRUCTION, INC. cited for?

F CARUSO CONSTRUCTION, INC. received 10 citation(s) covering 5 distinct OSHA standards. Total proposed penalties were $7,050.00. The inspection opened on 1996-03-13.

How much was F CARUSO CONSTRUCTION, INC. fined by OSHA?

OSHA proposed penalties of $7,050.00 against F CARUSO CONSTRUCTION, INC. in GLEN COVE, NY. Average per citation: $705.00.

Is F CARUSO CONSTRUCTION, INC. a safe workplace?

Based on enforcement records, F CARUSO CONSTRUCTION, INC. has a risk score of 16 out of 100. The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

How does this penalty compare to the industry average?

The average penalty for Industry Sector 00 facilities is $1,195.75. This facility penalty of $7,050.00 is above the industry average.