CROUNSE CORPORATION
According to U.S. Department of Labor enforcement records, CROUNSE CORPORATION — a ship building and repairing facility located at 400 MARINE WAY, PADUCAH, KY 42003 — was the subject of a formal OSHA inspection that resulted in 14 citation(s) and cumulative proposed penalties of $27,765.00. The inspection case was opened on 2013-03-07.
The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.
BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 3.3 per 100 full-time workers — 22% above the national average of 2.7. The sector fatality rate is 2.3 per 100,000 workers.
EPA Environmental Record: The EPA shows no current violations for this facility. regulated under: Clean Water Act. Source: EPA ECHO database.
Industry Benchmark: The total penalty of $27,765.00 is more than 4.3× the national average of $6,436.62 for facilities in the Manufacturing sector (NAICS 336611). This sector encompasses 82,943 inspected facilities nationwide with aggregate penalties totaling $533.9M.
State Context: Within KY, this facility's penalty places it at the 99th percentile among 26,562 inspected facilities. The statewide average penalty is $2,754.01.
Citation Analysis: The inspection produced 14 citations spanning 10 distinct OSHA regulatory standards. The citation breakdown includes: 8 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition. 6 other-than-serious — The violation has a direct relationship to job safety and health but is unlikely to cause death or serious physical harm.
Enforcement Timeline: Citations were issued beginning January 25, 2013 with the latest abatement deadline set for June 7, 2024. Of the 14 total citations, 0 (0%) have been marked as abated in DOL records, which may indicate ongoing compliance gaps requiring further regulatory attention.
Penalty Assessment: The cumulative penalty of $27,765.00 reflects OSHA's gravity-based penalty calculation methodology, which considers the severity of potential injury, the probability of occurrence, the employer's size, good faith, and violation history. The per-citation average of $1,983.21 falls within the standard penalty range.
The 2013 inspection of Crounse Corporation’s Paducah facility revealed
This facility's $27,765 penalty is higher than 81% of all penalized companies in the NAICS 336611 industry in KY. The state average penalty for this industry is $21,780.
Comparing penalized facilities in PADUCAH, KY (Exact Industry)
Explore more: OSHA enforcement in PADUCAH · Kentucky data · Search the database · Incident Rate Calculator
What OSHA violations was CROUNSE CORPORATION cited for?
CROUNSE CORPORATION received 14 citation(s) covering 10 distinct OSHA standards. Total proposed penalties were $27,765.00. The inspection opened on 2013-03-07.
How much was CROUNSE CORPORATION fined by OSHA?
OSHA proposed penalties of $27,765.00 against CROUNSE CORPORATION in PADUCAH, KY. Average per citation: $1,983.21.
Is CROUNSE CORPORATION a safe workplace?
Based on enforcement records, CROUNSE CORPORATION has a risk score of 22 out of 100. The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.
How does this penalty compare to the industry average?
The average penalty for Ship Building and Repairing facilities is $6,436.62. This facility penalty of $27,765.00 is above the industry average.