📍 I-15 & STATE ROAD 73, LEHI, UT 84043🏭 Construction (NAICS 238140)📅 2004-05-18
$10,000.00
Total Penalties
10
Citations
32/100
Risk Score
344
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, BECK MASONRY — a construction facility located at I-15 & STATE ROAD 73, LEHI, UT 84043 — was the subject of a formal OSHA inspection that resulted in 10 citation(s) and cumulative proposed penalties of $10,000.00. The inspection case was opened on 2004-05-18.

The volume of citations issued during this inspection suggests systematic compliance deficiencies rather than isolated incidents. Facilities with 10 or more citations typically face comprehensive abatement requirements and may be subject to follow-up inspections.

Industry Benchmark: The total penalty of $10,000.00 is more than 2.8× the national average of $3,609.14 for facilities in the Construction sector (NAICS 238140). This sector encompasses 532,749 inspected facilities nationwide with aggregate penalties totaling $1,922.8M.

State Context: Within UT, this facility's penalty places it at the 99th percentile among 21,375 inspected facilities. The statewide average penalty is $1,557.94.

Citation Analysis: The inspection produced 10 citations spanning 2 distinct OSHA regulatory standards. The citation breakdown includes: 8 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition. 2 repeat — A substantially similar violation was found during a previous inspection and the original citation has become a final order.

Enforcement Timeline: Citations were issued beginning July 8, 2004 with the latest abatement deadline set for July 13, 2004. Of the 10 total citations, 8 (80%) have been marked as abated in DOL records, indicating substantial compliance with corrective action requirements.

Penalty Assessment: The total proposed penalty of $10,000.00 falls within OSHA's standard enforcement range and may have been adjusted through informal settlement conference procedures, penalty reduction factors, or good faith credit for demonstrated safety and health management systems.

Citation Matrix — 10 Citations
29 CFR 1926.451(c)(02)
Scaffolding Safety Requirements
Serious
Penalty: $1,000.00Gravity: 10Issued: July 8, 2004Abated: ✓ Yes
29 CFR 1926.451(c)(03)
Scaffolding Safety Requirements
Serious
Penalty: $0.00Gravity: 10Issued: July 8, 2004Abated: ✓ Yes
29 CFR 1926.451(f)(03)
Scaffolding Safety Requirements
Serious
Penalty: $0.00Gravity: 10Issued: July 8, 2004Abated: ✓ Yes
29 CFR 1926.451(c)(03)
Scaffolding Safety Requirements
Repeat
Penalty: $4,000.00Gravity: 10Issued: July 8, 2004Abated: Pending
29 CFR 1926.451(f)(03)
Scaffolding Safety Requirements
Repeat
Penalty: $4,000.00Gravity: 10Issued: July 8, 2004Abated: Pending
29 CFR 1926.451(b)(02)
Scaffolding Safety Requirements
Serious
Penalty: $1,000.00Gravity: 10Issued: July 8, 2004Abated: ✓ Yes
29 CFR 1926.451(e)(01)
Scaffolding Safety Requirements
Serious
Penalty: $0.00Gravity: 10Issued: July 8, 2004Abated: ✓ Yes
29 CFR 1926.451(f)(04)
Scaffolding Safety Requirements
Serious
Penalty: $0.00Gravity: 10Issued: July 8, 2004Abated: ✓ Yes
29 CFR 1926.451(g)(01)
Scaffolding Safety Requirements
Serious
Penalty: $0.00Gravity: 10Issued: July 8, 2004Abated: ✓ Yes
29 CFR 1926.454(c)
Serious
Penalty: $0.00Gravity: 10Issued: July 8, 2004Abated: ✓ Yes
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
More UT Enforcement Records
US MAGNESIUM LLC
GRANTSVILLE, UT
$1.2M
72 cit.
SILVER EAGLE REFINING INC
WOODS CROSS, UT
$584.5K
75 cit.
GENEVA STEEL
OREM, UT
$252.6K
215 cit.
KENNECOTT UTAH COPPER
MAGNA, UT
$239.4K
58 cit.
DEL RAY JACKSON CONSTRUCTION
ST GEORGE, UT
$213.5K
12 cit.