Tier 3 Elevated

ANDRE TUCKPOINTING & BRICKWORK

📍 1200 SOUTH 7TH STREET, ST. LOUIS, MO 63104🏭 Masonry Contractors (NAICS 238140)📅 2004-05-06
$81,200.00
Total Penalties
15
Citations
48/100
Risk Score
398
Analysis Words
Enforcement Analysis

According to U.S. Department of Labor enforcement records, ANDRE TUCKPOINTING & BRICKWORK — a masonry contractors facility located at 1200 SOUTH 7TH STREET, ST. LOUIS, MO 63104 — was the subject of a formal OSHA inspection that resulted in 15 citation(s) and cumulative proposed penalties of $81,200.00. The inspection case was opened on 2004-05-06.

Cumulative penalties significantly exceed the national median for OSHA enforcement actions. The penalty amount suggests multiple high-gravity citations, indicating conditions that presented a substantial probability of death or serious physical harm to employees.

BLS Injury Data: According to the Bureau of Labor Statistics (2022), this industry sector has an occupational injury rate of 2.8 per 100 full-time workers — 4% above the national average of 2.7. The sector fatality rate is 9.6 per 100,000 workers.

Industry Benchmark: The total penalty of $81,200.00 is more than 22.5× the national average of $3,609.14 for facilities in the Construction sector (NAICS 238140). This sector encompasses 532,749 inspected facilities nationwide with aggregate penalties totaling $1,922.8M.

State Context: Within MO, this facility's penalty places it at the 100th percentile among 41,963 inspected facilities. The statewide average penalty is $2,902.40.

Citation Analysis: The inspection produced 15 citations spanning 7 distinct OSHA regulatory standards. The citation breakdown includes: 8 repeat — A substantially similar violation was found during a previous inspection and the original citation has become a final order. 7 serious — A workplace hazard that could cause death or serious physical harm exists, and the employer knew or should have known about the condition.

Enforcement Timeline: Citations were issued beginning June 7, 2004 with the latest abatement deadline set for April 29, 2005. Of the 15 total citations, 15 (100%) have been marked as abated in DOL records, indicating substantial compliance with corrective action requirements.

Penalty Assessment: The cumulative penalty of $81,200.00 reflects OSHA's gravity-based penalty calculation methodology, which considers the severity of potential injury, the probability of occurrence, the employer's size, good faith, and violation history. The per-citation average of $5,413.33 falls within the standard penalty range.

The enforcement record for Andre Tuckpointing & Brickwork reveals a profound systemic collapse of

Industry Benchmark (MO)

This facility's $81,200 penalty is higher than 99% of all penalized companies in the NAICS 238140 industry in MO. The state average penalty for this industry is $4,917.

$4,917
State Avg
$81,200
This Facility
Citation Matrix — 15 Citations
29 CFR 1926.100(a)
Fall Protection (Construction)
Repeat
Penalty: $2,800.00Gravity: 05Issued: June 7, 2004Abated: ✓ Yes
29 CFR 1926.451(e)(01)
Scaffolding Safety Requirements
Repeat
Penalty: $5,600.00Gravity: 10Issued: June 7, 2004Abated: ✓ Yes
29 CFR 1926.451(f)(03)
Scaffolding Safety Requirements
Repeat
Penalty: $5,600.00Gravity: 10Issued: June 7, 2004Abated: ✓ Yes
29 CFR 1926.451(g)(01)
Scaffolding Safety Requirements
Repeat
Penalty: $5,600.00Gravity: 10Issued: June 7, 2004Abated: ✓ Yes
29 CFR 1926.451(b)(01)
Scaffolding Safety Requirements
Repeat
Penalty: $5,600.00Gravity: 10Issued: April 19, 2005Abated: ✓ Yes
29 CFR 1926.451(g)(01)
Scaffolding Safety Requirements
Repeat
Penalty: $14,000.00Gravity: 10Issued: April 19, 2005Abated: ✓ Yes
29 CFR 1926.451(g)(04)
Scaffolding Safety Requirements
Repeat
Penalty: $5,600.00Gravity: 10Issued: April 19, 2005Abated: ✓ Yes
29 CFR 1926.20(b)(02)
Construction Safety Training & Education
Serious
Penalty: $5,600.00Gravity: 10Issued: April 19, 2005Abated: ✓ Yes
29 CFR 1926.102(a)(01)
Serious
Penalty: $2,800.00Gravity: 10Issued: April 19, 2005Abated: ✓ Yes
29 CFR 1926.200(g)(01)
Serious
Penalty: $2,800.00Gravity: 10Issued: April 19, 2005Abated: ✓ Yes
29 CFR 1926.416(a)(01)
Electrical Safety (Construction)
Serious
Penalty: $2,800.00Gravity: 10Issued: April 19, 2005Abated: ✓ Yes
29 CFR 1926.451(c)(01)
Scaffolding Safety Requirements
Serious
Penalty: $2,800.00Gravity: 10Issued: April 19, 2005Abated: ✓ Yes
29 CFR 1926.454(a)
Serious
Penalty: $2,800.00Gravity: 10Issued: April 19, 2005Abated: ✓ Yes
29 CFR 1926.454(b)
Serious
Penalty: $2,800.00Gravity: 10Issued: April 19, 2005Abated: ✓ Yes
29 CFR 1926.100(a)
Fall Protection (Construction)
Repeat
Penalty: $14,000.00Gravity: 10Issued: April 19, 2005Abated: ✓ Yes
This report is compiled from publicly available U.S. Department of Labor enforcement data under the Freedom of Information Act. SVEP Navigator is an independent research and analysis platform and is not affiliated with, endorsed by, or connected to OSHA, the Department of Labor, or any federal agency. Information is provided for research, educational, and compliance planning purposes only and does not constitute legal advice. Penalty amounts shown are proposed penalties and may have been modified through contest proceedings or settlement.
Local Competitor Benchmark

Comparing penalized facilities in ST. LOUIS, MO (Exact Industry)

ANDRE TUCKPOINTING & BRICKWORK (This Facility)
$81.2K
15 cit.
ANDRE TUCKPOINTING & BRICKWORK DBA ANDRE TUCKPOINT
$240.0K
6 cit.
ANDRE TUCKPOINTING & BRICK WORK
$156.8K
5 cit.
SUMMIT RESTORATION & CONSTRUCTION
$43.0K
6 cit.
More MO Enforcement Records
THOMAS INDUSTRIAL COATINGS, INC.
KANSAS CITY, MO
$1.5M
43 cit.
ZMDR LLC
LONE JACK, MO
$654.5K
48 cit.
DNRB, INC.
KANSAS CITY, MO
$511.0K
11 cit.
BUTTERBALL TURKEY COMPANY
CARTHAGE, MO
$508.2K
123 cit.
DOE RUN COMPANY
HERCULANEUM, MO
$440.4K
145 cit.
Other Inspected Facilities in ST. LOUIS, MO
ANDRE TUCKPOINTING & BRICKWORK DBA ANDRE TUCKPOINT
$240.0K
6 cit.
JOHN J. STEUBY
$176.2K
65 cit.
ANDRE TUCKPOINTING & BRICK WORK
$156.8K
5 cit.
INTERSTATE BRANDS CORPORATION
$100.3K
28 cit.
AMERICAN PULVERIZER CO.
$76.6K
54 cit.
Related Guides & Tools
OSHA Fines & Penalties Guide →
How OSHA calculates penalties and maximum fine amounts.
After an OSHA Inspection →
Citations, appeals, and penalty negotiation steps.
Top 10 OSHA Violations →
The most frequently cited standards nationwide.
Construction Safety Data →
Industry-wide violation stats and rankings.

Explore more: OSHA enforcement in ST. LOUIS · Missouri data · Search the database · Incident Rate Calculator

Frequently Asked Questions
What OSHA violations was ANDRE TUCKPOINTING & BRICKWORK cited for?

ANDRE TUCKPOINTING & BRICKWORK received 15 citation(s) covering 7 distinct OSHA standards. Total proposed penalties were $81,200.00. The inspection opened on 2004-05-06.

How much was ANDRE TUCKPOINTING & BRICKWORK fined by OSHA?

OSHA proposed penalties of $81,200.00 against ANDRE TUCKPOINTING & BRICKWORK in ST. LOUIS, MO. Average per citation: $5,413.33.

Is ANDRE TUCKPOINTING & BRICKWORK a safe workplace?

Based on enforcement records, ANDRE TUCKPOINTING & BRICKWORK has a risk score of 48 out of 100. Cumulative penalties significantly exceed the national median for OSHA enforcement actions. The penalty amount suggests multiple high-gravity citations, indicating conditions that presented a substantial probability of death or serious physical harm to employees.

How does this penalty compare to the industry average?

The average penalty for Masonry Contractors facilities is $3,609.14. This facility penalty of $81,200.00 is above the industry average.